FSRU of the Açu Port ready in 2019

08/29/18   Floating regasification unit commissioned from BW LNG is being built in South Korea   The floating regasification unit (FSRU) commissioned by Açu Natural Gas (GNA Açu) is scheduled to be delivered in March 2019 by the South Korean shipyard DSME. The BW LNG vessel will make up the LNG terminal at Açu Port... Continue Reading →

Greener AHTSs Fleet

08/29/18 Participation of foreign vessels to support platform anchoring operations fell from 73% to 27% in one year   The fleet of vessels supporting anchor operations (AHTSs) in Brazil is increasingly green and yellow. Between July 2017 and the same month of this year, 14 foreign-flagged units left the country, reducing their participation from 73%... Continue Reading →

Blog at WordPress.com.

Up ↑