Brava Energia Production Data May 2026

June 4 – BRAVA ENERGIA S.A. (“Brava” or “Company”) (B3: BRAV3), informs its investors and the market in general of the preliminary and unaudited production data for the month of May 2026.

Potiguar – The Company has been gradually resuming operations at the facilities that were suspended in October 2025 following an audit conducted by the ANP. The increase in oil production in May is a result of the gradual resumption of the Fazenda Belém Hub, which had been affected by the suspension.

Brava operates the Potiguar, Recôncavo, Papa-Terra, Atlanta, and Peroá assets, and also holds a non-operated 35% stake in Pescada, 45% in the Manati Field, both operated by Petrobras, and 23% in Parque das Conchas, operated by Shell. Detailed production information per asset is updated monthly in the Company’s valuation guide, available on the Investor Relations website, click here to access it

Leave a comment

Blog at WordPress.com.

Up ↑