With BW Offshore FPSO’s stay prolonged, Tullow puts all options on the table for stake in oil field off Ivory Coast

(OET) UK-headquartered oil and gas company Tullow Oil is mulling over all options for its interest in an oil field located offshore the Ivory Coast. This comes after BW Offshore secured a short-term contract extension for one of its floating, production, storage and offloading (FPSO) vessels, which is working at the field. As Tullow Oil’s... Continue Reading →

Jan De Nul’s Next-Gen Installation Vessels to Install RWE’s Offshore Wind Farms

(OE) German renewable energy firm RWE has signed an agreement with Luxembour-based offshore installation firm Jan De Nul Group to secure the long-term usage of two next-generation installation vessels, “Les Alizés” and “Voltaire, for future offshore wind foundation and turbine construction.  The charters are supported by a Service Agreement through which Jan De Nul Group... Continue Reading →

Ocyan undergoes restructuring, giving birth to new drilling player

(OET) Brazilian offshore oil and gas industry services provider Ocyan has confirmed the completion of its restructuring process, which enabled it to separate its drilling business into a new company, temporarily being called DrillCo. The business side covering offshore production, subsea construction and decommissioning, maintenance, and offshore services remains fully at Ocyan, according to the... Continue Reading →

Stackable Floating Wind Platform Gets DNV Approval

(OW) DNV has awarded Bassoe Technology an Approval in Principle (AiP) for a 17 MW D-Floater floating wind foundation, designed to withstand extreme 50-year typhoon conditions in the South China Sea. The AiP verifies that the design is feasible for the intended application, and, in principle, complies with the applicable requirements in accordance with DNV... Continue Reading →

Orsted to invest $68 bln in power capacity by 2030

(Reuters) - Renewable energy group Orsted (ORSTED.CO) will invest 475 billion Danish crowns ($68 billion) to achieve a 2030 goal to install 50 gigawatts (GW) of power capacity, it said in an investor update on Thursday. The Danish company said the plans were fully self-funded and it expected to exceed goals set in 2021 for earnings before... Continue Reading →

Blog at WordPress.com.

Up ↑