Jul 14, 2020
Perenco is finalizing the development plan for the Polo Nordeste, a complex that integrates the Pargo, Carapeba and Vermelho fields, in shallow waters of the Campos basin. The document will be forwarded to the ANP for evaluation until Friday (17 ), requesting the extension of the concession period for the three assets until 2040.
Perenco’s plan for the Campos Basin project provides for the installation of a floating storage and transhipment unit.
Source: PetroleoHoje
Leave a Reply