Installation License for Mero FPSO sought by Petrotras

Petrobras asked for the installation license (LI) for the Carioca FPSO (Mero I), the production pilot of the Mero field, in the Santos pre-salt. It will be the first definitive FPSO at Mero. The Carioca is being built and will be operated by Modec, with first oil planned for 2021.

Mero produced 41,000 barrels a day in April, with a production well and a gas injection well linked to Ocyan / Teekay’s FPSO, Pioneiro de Libra, from the anticipated Mero production system.

Source: epbr

Leave a Reply

This site uses Akismet to reduce spam. Learn how your comment data is processed.