Guyana: Saipem offloads pipes for Liza Phase 1

guyana-saipem-offloads-pipes-for-liza-phase-1-768x576

Italian oilfield services company Saipem has offloaded the second shipment of pipes to be installed as part of Exxon’s Liza Phase One project offshore Guyana.

The Guyanese authorities have informed that the shipment arrived in Georgetown last week, and is the second of multiple shipments adding to the 1519 pieces of pipes received in December.

The delivery consists of oil production flow-lines and gas and water reinjection pipes. These pipes will be laid on the seafloor at the Liza Phase One Development, located approximately 120 miles offshore Guyana at a water depth of 1,800 meters.

Continue reading

Leave a Reply