Petrobras orders subsea production system for Mero from Aker Solutions

Norwegian Aker Solutions has signed a contract with Petrobras to provide a subsea production system and related services for the Mero 1 project within the Mero field development, one of the largest oil discoveries in Brazil’s pre-salt area.

Aker Solutions informed on Friday that the subsea production system will consist of 12 vertical subsea trees designed for Brazil’s pre-salt, four subsea distribution units, three topside master control stations for the Mero 1 Guanabara FPSO and spare parts. The order also includes installation and commissioning support services.

Read more

Leave a Reply

This site uses Akismet to reduce spam. Learn how your comment data is processed.