Uncategorized

Petrobras requests Operationing License for Búzios IV

8/14/18

The start of production of the onerous assignment system by P-77 is scheduled for 2019

Petrobras requested from IBAMA the operating license for the development of the production and disposal of Búzios IV, which will be through FPSO P-77. So far, the field development project in the Santos Basin has already had four wells drilled. Production in Búzios IV is expected to start in 2019.

Búzios, in the Northern part of the Santos Basin, is the first area of ​​Onerous Assignment developed. The 2010 contract had a declaration of commerciality in December 2013. According to PNG 2018-2022, five units are scheduled: P-74, P-75, P-76 (all for the second half of 2018), P-77 (2019) and Búzios V (2021).

The oil company is bidding for the Búzios V unit, whose best proposal was presented by the new Exmar. The companies negotiate the charter fee and technical and commercial issues.

On April 20, Petrobras started the production of the field, with the start-up of the P-74, which inaugurated the module I, operating in the central part.

Source: Brazil Energy

Categories: Uncategorized

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google+ photo

You are commenting using your Google+ account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s