January 15, 2026 –Petróleo Brasileiro S.A. – Petrobras announces that, in 2025, its oil production reached 2.40 million barrels of oil per day (bpd), exceeding the upper limit of the target (+4%) set in its 2025-2029 Business Plan by 0.5 percentage points. This result represents an 11% increase compared to 2024 production. Total oil and... Continue Reading →
MODEC Picks Everllence Compression Systems for Brazil FPSO
Jan. 15 (OE) MODEC has commissioned Everllence to supply five compressor trains for its new Floating Production Storage and Offloading (FPSO) for the Gato do Mato - Orca Project offshore Brazil. The FPSO will be moored in the pre-salt area of the Santos Basin, approximately 200 kilometers south of Rio de Janeiro, at a water... Continue Reading →
ExxonMobil Enlists Shearwater for 3D Seismic Survey in Trinidad & Tobago deepwater
Jan. 15 (OE) Offshore seismic services firm Shearwater Geoservices has secured a contract for a large 3D seismic acquisition program for ExxonMobil Trinidad and Tobago Deepwater. The deepwater survey offshore Trinidad and Tobago will cover approximately 6,000 square kilometers of full-fold area. The acquisition is scheduled to commence in the first quarter of 2026 and... Continue Reading →
ABS and AMOG to Advance Offshore Mooring Digital Twin Technology
Jan.14 (OE) ABS and AMOG Consulting have signed a memorandum of understanding (MOU) to collaborate on an offshore mooring digital twin. The agreement combines AMOG’s monitoring technology with ABS’ classification and certification capabilities to deliver a highly detailed integrity-monitoring solution for floating offshore assets. The system will provide a digital model of moorings, risers, and... Continue Reading →
Tupi/Iracema Field Reaches Production of 1 Million Barrels per Day Again
Jan. 14 - The Tupi/Iracema field, located in the pre-salt layer of the Santos Basin, reached a production of 1 million barrels/day this Friday (January 9th), repeating the historic mark first achieved in 2019. This result aligns with Petrobras' new 2026-30 Business Plan, which foresees an increase in oil and gas production through the management... Continue Reading →
Guyana’s next development targeting close to one billion barrels of oil
Jan. 13 (oilnow.gy) Guyana is preparing for its next major step in offshore oil production with the Uaru development, ExxonMobil’s upcoming project in the Stabroek Block. Rather than opening a new frontier, Uaru deepens production in an already proven basin. The project is built around scale. More than 800 million barrels of recoverable oil are... Continue Reading →
Saipem Hires EnerMech for Whiptail Subsea Job Offshore Guyana
Jan. 13 (OE) Energy services firm EnerMech has secured a subsea pre-commissioning services contract by Saipem for the Whiptail development, offshore Guyana in the Stabroek Block, operated by ExxonMobil Guyana. The contract award marks EnerMech’s first project on the Whiptail field and builds on its proven track record supporting subsea pre-commissioning campaigns offshore Guyana, including... Continue Reading →
ANP requests clarifications from Petrobras before authorizing the resumption of drilling in the Foz do Amazonas Basin
Jan. 8 (PN) The National Petroleum Agency (ANP) has requested clarifications from Petrobras before authorizing the resumption of drilling at the Morpho well in the Foz do Amazonas Basin. The activity was suspended after two auxiliary lines connected to the ODN-II drillship, chartered by Foresea, registered a loss of drilling fluid last Sunday. The ANP... Continue Reading →
Ibama Requests Technical Details from Petrobras Regarding Biodegradable Fluid Leak at the Equatorial Margin
Jan. 8 - The Brazilian Institute of Environment and Renewable Natural Resources (Ibama) sent an official letter to Petrobras (PETR3;PETR4), requesting technical information about the biodegradable fluid leak accident during offshore drilling activity in Block FZA-M-59, on the Equatorial Margin. The letter was sent by the General Coordination of Environmental Licensing of Marine and Coastal... Continue Reading →
Axess Group secures asset integrity contract with Noble for Guyana drillships
Jan. 8 (oilnow.gy) Axess Group has secured a long-term Asset Integrity Management contract with Noble Corporation for operations offshore Guyana. The agreement covers inspection and certification services for four Noble drillships operating in Guyana’s offshore basin. The work is aimed at supporting safety, regulatory compliance, and operational performance. Under the contract, Axess said on January... Continue Reading →