Petrobras on discovery in the Aram Block

Petróleo Brasileiro S.A. – Petrobras, following up on the release disclosed on November 19, 2021, informs that the drill-stem test in the wildcat well 1-BRSA-1381-SPS (Curaçao), located in the Pre-salt section in the southwestern portion of the Santos Basin, has been successfully completed. The discovery in the Aram Block is located 240 km from the... Continue Reading →

GE cuts full-year earnings forecast on troubles at renewable energy business

 (Reuters) - General Electric Co (GE.N) on Tuesday trimmed its full-year profit forecast after reporting a decline in third-quarter earnings, primarily due to higher warranty and related reserves at its renewable energy business. The company, however, reported much higher-than-expected free cash flow. Its quarterly revenue also topped Wall Street's estimates. GE's shares were down about 1.8% at... Continue Reading →

Scotland: MPS to Provide Floating Platform for Simply Blue’s Planned 100MW Wind Farm

Renewable energy technology company Marine Power Systems has partnered up with floating wind farm developer Simply Blue Group to develop a project proposal for the Innovation and Targeted Oil and Gas (INTOG) leasing round run by Crown Estate Scotland. Innovation and Targeted Oil and Gas Decarbonisation (INTOG) seabed leasing round will allow developers to apply for... Continue Reading →

Test Results Are In: Gazelle’s Floating Wind Platform Design Principles Confirmed

Gazelle Wind Power, the developer of a hybrid modular floating offshore wind platform, said Thursday it had received the results of its basin model tests at the Environmental Hydraulics Institute-University of Cantabria (IHCantabria) facilities in Spain.  According to Gazelle, the test report, witnessed by DNV and Safier Ingenierie, verified the feasibility of the Gazelle platform’s... Continue Reading →

Blog at WordPress.com.

Up ↑