Strohm Wraps Up Deepwater TCP Trials for Petrobras

(OE) Strohm, a thermoplastic composite pipe (TCP) solutions specialist, has completed the first field trials with Petrobras for its TCP pipe design offshore Brazil, at water depths of approximately 1,500 meters. The testing and engineering assessments, which were conducted in the Campos Basin in June, have demonstrated the pipe’s performance under real-world conditions as well... Continue Reading →

McDermott Lands Brava Energia’s Job off Brazil

McDermott has been awarded a sizeable offshore transportation and installation contract by Brava Energia for the Papa-Terra field in the Campos Basin and the Atlanta field in Block BS-4 within the Santos Basin, both offshore Brazil. Under the contract scope, McDermott will execute the transportation and installation of flexible pipelines, umbilicals and associated subsea equipment... Continue Reading →

Exail to equip Petrobras FPSOs with Quadrans AHRS in Brazilian offshore project

– Exail, a global leader in inertial navigation technologies, has secured a contract with Brazilian offshore services company Mitang to deliver 30 Quadrans Attitude and Heading Reference Systems (AHRS). These units will be installed on Floating Production, Storage and Offloading units (FPSOs) operated by Petrobras off the coast of Brazil. The Quadrans AHRS provides real-time... Continue Reading →

Work Starts on Brazil’s First Offshore Wind Project, Pilot Expected to Come Online in 3 Years

(offshoreWIND.biz) Brazil’s SENAI Institute of Innovation in Renewable Energy (ISI-ER) and SENAI’s Rio Grande do Norte branch, SENAI-RN, expect to receive the installation permit for their pilot project, the country’s first offshore wind project to be granted a preliminary licence, within 12 to 18 months and to have it operational within 36 months. Following the... Continue Reading →

Blog at WordPress.com.

Up ↑