With FSRU on site, Brazilian LNG terminal put into operation

(Offshore-energy.biz) U.S. energy infrastructure player New Fortress Energy (NFE) has kicked off operations at its liquefied natural gas (LNG) import terminal in Santa Catarina, Brazil, following the arrival of a floating storage and regasification unit (FSRU).

According to New Fortress Energy, the Terminal Gas Sul (TGS) LNG terminal in Santa Catarina has now become operational. This occurred after the arrival of the FSRU Energos Winter, which was expected in January 2024. The company executed a definitive agreement with Petrobras in November 2023 for the FSRU with a capacity of 138,250 m3.

For complete article read: https://www.offshore-energy.biz/with-fsru-on-site-brazilian-lng-terminal-put-into-operation/

Leave a comment

Blog at WordPress.com.

Up ↑