TechnipFMC delivered the last of 127 wet Christmas trees (ANMs) contracted by Petrobras in 2012 for pre-salt projects, the company announced on social media on Monday (5/10).
The $ 1.5 billion contract was signed with FMC Technologies, which merged with Technip in 2017.
Source: PetroleoHoje
Leave a comment