May 27, 2020
McDermott will start, in the first week of June, the launch of the last stretch of Rota 3, a gas pipeline that will connect the Santos Basin pre-salt to Comperj, in Itaboraí (RJ).
The campaign will be carried out with the DLV 2000 vessel, which belongs to the group’s fleet. Locar Pipe has been replaced in the campaign to launch the pre-salt gas pipeline.
Source: PetroleoHoje
Leave a Reply