
Heerema Fabrication Group (HFG) has awarded engineered hydraulic solutions specialist DGI Doedijns a contract to design and deliver the upend & flood control system for the Peregrino II jacket to be set off Brazil.
DGI said on Tuesday that the upend control center consists of 56 actuated valves, a control center, and interconnecting hoses.
The company added that it would also provide the yard installation of the equipment.
Leave a comment