Work Starts on Brazil’s First Offshore Wind Project, Pilot Expected to Come Online in 3 Years

(offshoreWIND.biz) Brazil’s SENAI Institute of Innovation in Renewable Energy (ISI-ER) and SENAI’s Rio Grande do Norte branch, SENAI-RN, expect to receive the installation permit for their pilot project, the country’s first offshore wind project to be granted a preliminary licence, within 12 to 18 months and to have it operational within 36 months. Following the... Continue Reading →

Enhanced Oil Spill Detection System Starts Operating Offshore Brazil

(OE) Miros, in partnership with Belga Marine, has enhanced its Oil Spill Detection (OSD) monitoring system system to include cloud-based monitoring capabilities that are now fully operational across several production assets offshore Brazil. The updated OSD monitoring system has been deployed across multiple production assets of a major Brazilian energy company. By integrating Miros’ technology... Continue Reading →

J-Power Joins Spanish Floating Wind Demo

(offshoreWIND.biz) Japan’s Electric Power Development, also known as J-Power, has joined the WHEEL floating offshore wind demonstration project in Spain. The WHEEL demonstration project is led by the Madrid-headquartered company Esteyco. WHEEL will feature one turbine installed three kilometres off the eastern coast of Gran Canaria, Spain. Through this project, J-Power aims to acquire knowledge... Continue Reading →

Petrobras informs about Incentivized Debentures

Petróleo Brasileiro S.A. – Petrobras, following up on the Material Facts disclosed on May 28 and May 30, 2025, announces that it has concluded the bookbuilding process for the 8th (eighth) issuance of simple debentures, not convertible into shares, unsecured, in the total amount of R$ 3,000,000,000.00 (three billion reais) (“Debenture Issuance”), which will be... Continue Reading →

Blog at WordPress.com.

Up ↑