Suriname oil development could be most expensive to date in Guyana Basin

(oilnow.gy) Staatsolie said Suriname’s first oil development in the shared basin could cost US$13.2 billion. This would represent the highest development expense for such a project, costing more than any of the six projects already sanctioned for nearby Guyana in the same basin.  TotalEnergies, the operator for the Gran Morgu project, had said the project’s estimated cost is... Continue Reading →

Offshore Wind Turbines in 2024: 20+ MW Prototypes Rolling Out in Europe, China; 16 MW Remains Most Powerful Turbine Installed Offshore

(OffshoreWIND.biz) In offshoreWIND.biz‘s 2023 annual wind turbine overview from January 2024, you could have read about the first 16 MW model installed offshore and a 22 MW turbine about to enter development. Fast forward twelve months, a 21 MW prototype in Europe and 22 MW and 26 prototypes in China are expected to soon be installed... Continue Reading →

Harnessing cutting-edge technologies to shape next-generation FPSO future

(offshore-energy.biz) The global offshore energy industry’s floating production solutions have come a long way from their humble beginnings and seem to be poised to continue their evolution driven by the need to tap deeper into challenging offshore environments buttressed by growing energy demand, rising security of supply concerns, and increasing climate change prompts to pivot... Continue Reading →

Petrobras Hires Seadrill’s Drillship Pair for Brazil Ops

(OE) Petrobras has awarded contracts to Seadrill’s two ultra-deepwater drillships – West Jupiter and West Tellus – for work offshore Brazil. West Jupiter has been hired under a 1,095-day contract, following a competitive tender process. The contract will contribute approximately $493 million to Seadrill’s order backlog, including additional services and excluding a mobilization fee of... Continue Reading →

Exxon continues appraisal of Haimara gas discovery

(oilnow.gy) ExxonMobil continues drilling at the Haimara-3 well, appraising its Haimara-1 gas discovery of 2019. Guyana’s Maritime Administration Department (MARAD) said the Stena Carron rig will be engaged in drilling at the Stabroek Block, with the operation set to conclude by December 31, 2024. Previous drilling at the well was conducted in July with the Stena DrillMAX,... Continue Reading →

Brazil Lifts Ban on Saipem’s Business Units

(OE) Saipem SA and Saipem do Brasil have become fully operational with state-owned companies in the Brazilian market following the annulment of the prohibitory sanctions issued by the Federal Court of Brasilia. On December 20, 2024, the Federal District Court of Brasilia, ruling on the petition of Saipem SA and Saipem do Brasil, established that... Continue Reading →

Blog at WordPress.com.

Up ↑