Brazil’s Foz do Amazonas now seen as ‘akin to Guyana’s Stabroek Field’ – Horizon Engage

(oilnow.gy) Brazil’s Foz do Amazonas Basin is being viewed by top industry players as that country’s top offshore frontier opportunity, with Horizon Engage reporting that aggressive bidding there signals strong private-sector belief in the Equatorial Margin as “akin to Guyana’s Stabroek field”. According to Horizon Engage Senior Advisor for Brazil and Energy Transition, Mark Langevin, consortia including Petrobras, ExxonMobil,... Continue Reading →

Japanese duo starts building Shell’s Brazil-bound FPSO

(offshore-energy.biz) The steel-cutting ceremony for a floating production storage and offloading (FPSO) unit destined for a field offshore Brazil operated by the Brazilian subsidiary of the U.K.-headquartered energy giant Shell has been held at the Sumitomo Heavy Industries’ Yokosuka shipyard in Japan. Based on a social media post by Cristiano Pinto da Costa, President of Shell Brasil,... Continue Reading →

Exail to equip Petrobras FPSOs with Quadrans AHRS in Brazilian offshore project

– Exail, a global leader in inertial navigation technologies, has secured a contract with Brazilian offshore services company Mitang to deliver 30 Quadrans Attitude and Heading Reference Systems (AHRS). These units will be installed on Floating Production, Storage and Offloading units (FPSOs) operated by Petrobras off the coast of Brazil. The Quadrans AHRS provides real-time... Continue Reading →

Equinor’s deepwater gas RAIA project moves forward with preliminary production license and approval for construction of gas pipeline

(PN) The Brazilian Institute of the Environment (Ibama) granted the preliminary license for oil and gas production activities at the Raia Project, operated by Equinor in the pre-salt layer of the Campos Basin. Also, the National Petroleum Agency (ANP) approved the construction of the 200 km gas pipeline that will connect the Raia FPSO to... Continue Reading →

Work Starts on Brazil’s First Offshore Wind Project, Pilot Expected to Come Online in 3 Years

(offshoreWIND.biz) Brazil’s SENAI Institute of Innovation in Renewable Energy (ISI-ER) and SENAI’s Rio Grande do Norte branch, SENAI-RN, expect to receive the installation permit for their pilot project, the country’s first offshore wind project to be granted a preliminary licence, within 12 to 18 months and to have it operational within 36 months. Following the... Continue Reading →

Blog at WordPress.com.

Up ↑