Independent Operators Lead 2020 FPSO Surge

2020 will be a peak year for floating production, storage and offloading unit (FPSO) demand with up to 14 awards forecast in Wood Mackenzie’s base case scenario, half of which will be located offshore Latin America. Only two of these facilities are expected to be Petrobras units; a result of the increasing number of international... Continue Reading →

Petrobras clarifies on Gaspetro

February 3, 2020 Petróleo Brasileiro SA - Petrobras, in relation to the news published in the media, concerning the sale of its 51% stake in Petrobras Gás SA (Gaspetro), clarifies that the sale model of the subsidiary is not yet defined. Petrobras, within the scope of its active portfolio management, has already started studies for... Continue Reading →

Platform P-70 is stabilized

Feb 1, 2020 Petrobras has already redirected the P-70 to the area where it will be anchored in Guanabara Bay to wait for the necessary authorizations before proceeding to the Atapu field, in the Santos Basin pre-salt. Due to the storm that hit the metropolitan region of Rio de Janeiro on Thursday night (01/30), the... Continue Reading →

Ex-Sembcorp Marine employee in Brazil charged for money laundering and corruption

Two people connected to Singapore’s rig builder Sembcorp Marine have faced charges for money laundering and corruption related to a drilling rig construction contract with Brazil’s drilling contractor Sete Brasil. Sembcorp Marine said on Monday that the Ministério Público Federal in Brazil (MPF) had filed charges against Guilherme Esteves de Jesus (GDJ) for money laundering... Continue Reading →

Veolia’s Seawater System for MODEC FPSO

Japanese FPSO giant MODEC has ordered a seawater treatment package for the FPSO Almirante Barroso from Veolia Water Technologies. Under the contract, Veolia will be responsible for the design and procurement of equipment with construction for a seawater treatment plant sized for 280,200 BPD (44,450 m3 /day) of low sulfate water for the Almirante Barroso... Continue Reading →

Brazilian shipyard completes Mero FPSO modules

Brazil’s offshore construction specialist Estaleiros do Brasil Ltda (EBR) has completed the construction of two modules for the FPSO Guanabara MV31. The FPSO is being built by MODEC Offshore Production Systems Singapore and will operate in the Mero field in the giant pre-salt region offshore Brazil. EBR said on Friday that the modules, shipped on... Continue Reading →

Blog at WordPress.com.

Up ↑