MODEC Gets ABS Nod for Floating Wind Turbine Design

(OE) MODEC has received an Approval in Principle (AiP) from the American Bureau of Shipping (ABS) for its floating wind turbine concept, the i-TLP2. With its tension leg platform (TLP)-oriented features, the i-TLP2 is said to minimize floater motions and seabed footprint. It incorporates significant improvements from the first-generation MODEC TLP, enabling rapid construction and... Continue Reading →

New research project looking to minimize failure and repair costs of floating wind dynamic cables, mooring lines

(offshore-energy.biz) A new project has been launched in the UK to improve the effectiveness of mooring lines and dynamic cables on floating offshore wind farms. Historically, mooring repair costs for oil production assets have exceeded GBP 400 million (approximately $542 million; €461 million) for a single incident, while cable failures have accounted for between 70%... Continue Reading →

Blog at WordPress.com.

Up ↑