(PN) British oil company BP has notified the National Petroleum Agency (ANP) about the discovery of oil signs in the pioneer well of the Pau Brasil block, in the pre-salt layer of the Santos Basin. As we reported, the well (which received the technical name 1-BP-12D-RJS) is located in a water depth of 2,283 meters... Continue Reading →
CNPE approves auction of new PRE-SALT blocks, grants PETROBRAS preference in the JASPE block.
(PN) After approving the National Energy Transition Policy and other measures related to the green economy, the National Energy Policy Council (CNPE) made its decision and defined the parameters for new pre-salt blocks. In practice, the measure authorizes the Rubi and Granada areas, in the Santos Basin pre-salt, to be auctioned in a future round... Continue Reading →
New Seismic Survey Begins at Buzios Field
In August, Petrobras obtained an environmental license from Ibama to begin seismic research activities in the Búzios Field, in the Santos Basin. This is the second OBN (Ocean Bottom Nodes) acquisition for the field, and the first for 4D monitoring The goal is to generate high-quality data, with cutting-edge technology, to improve the identification of... Continue Reading →
Contract extension puts DOF high-end subsea vessel to work until May 2028
(offshore-energy.biz) DOF Subsea has secured a contract extension for its high-end subsea vessel that will keep the vessel busy until mid-2028. The new commitment for DOF’s Skandi Africa will run until May 2028 and will commence in direct continuation with the current commitment, which runs until February 2025. According to the company, the high-end subsea vessel... Continue Reading →
Longtail could be Exxon’s 8th development offshore Guyana
(OilNow..gy) Guyana’s next Stabroek Block development could potentially be ExxonMobil’s Longtail discovery, Vickram Bharrat, the country’s Minister of Natural Resources said. “They are already moving ahead with Hammerhead, and we have heard talks that Longtail will come after that,” he said. The Longtail-1 discovery in the Stabroek Block was drilled in 2018, encountering approximately 256... Continue Reading →
Guyana Hammerhead Oil Project Plan Expected in 2025
(Reuters) A development plan for Guyana's seventh offshore oil project is expected early next year, Natural Resources Minister Vickram Bharrat said on Wednesday, and would bring the South American nation's total oil production to more than 1.4 million barrels per day. The South American country has emerged as the fastest growing oil nation in the... Continue Reading →
Petrobras Rumored to be Considering Additional FPSO for Its Buzios Field
(Reuters) State-run oil firm Petrobras has begun studies for the implementation of a new oil platform in Brazil's Buzios field, three sources with knowledge of the matter told Reuters. Each Buzios platform has an average cost of $3.5 billion, said a source, adding that the one under study would be a FPSO (floating production storage... Continue Reading →
New drilling technology to put billions of barrels of oil in reach, analysts say
(Reuters) - An oil production breakthrough that producers say can safely tap ultra-high pressure fields could put up to 5 billion barrels of previously inaccessible crude into production, analysts said. Chevron on Monday disclosed it had pumped first oil from a field at 20,000 pounds per square inch pressures, a third greater than any prior well. Its... Continue Reading →
SBM Offshore completes topside modules stage on FPSO ALEXANDRE de GUSMÃO
(PN) SBM Offshore has completed a new stage in the construction of FPSO Alexandre de Gusmão, which will be installed in the Mero field, in the pre-salt layer of the Santos Basin. The Dutch company announced this week that the lifting campaign for the vessel's topside modules was successfully completed. Integration and commissioning activities continue... Continue Reading →
Ibama grants license foe 4D seismic survey in the Buzios Field
(PN) Earlier this month, the Brazilian Institute of the Environment (Ibama) issued a license authorizing Petrobras to begin a 4D seismic survey with nodes in the Buzios field, in the pre-salt layer of the Santos Basin. The survey may be conducted using one of the seismic source vessels: Artemis Arctic or Artemis Odyssey. In addition,... Continue Reading →