Dyna-Mac pursuing ‘win-win’ opportunities in FPSO module fabrication and carbon capture and storage

(OET) Singapore’s offshore builder Dyna-Mac has set the wheels into motion to enable more flexibility in addressing spikes in floating production storage and offloading (FPSO) module fabrication demand and embark on a hot pursuit of global carbon capture and storage (CCS) projects, thanks to two memoranda of understanding. The first memorandum of understanding (MOU) was... Continue Reading →

Petrobras on FPSO Anita Garibaldi

Petróleo Brasileiro S.A. – Petrobras informs that it put into production, this Wednesday, 08/16/2023, the Anita Garibaldi platform ship in the Campos Basin. Of the FPSO type (floating system that produces, stores and transfers oil), the unit will operate simultaneously in the post-salt and pre-salt of the Marlim and Voador fields. With a capacity to... Continue Reading →

Petrobras announces installation of the first fully electric FPSO platform in the Campos Basin – Espirito Santo

(C) The first platform with fully electrified (all-electric) combined cycle systems in the country will be installed off the coast of Espírito Santo in 2025, announced Petrobras, the project will allow greater operational efficiency, in addition to reducing greenhouse gas emissions. The confirmation of the platform, called FPSO Maria Quitéria, which will be located in... Continue Reading →

SBM Offshore’s H1 core profit misses estimates, falls below 2022 level

(Reuters) - Dutch oil and gas services company SBM Offshore (SBMO.AS) reported on Thursday half-year earnings before interest, tax, depreciation and amortisation (EBITDA) that missed consensus estimates and fell below the year-earlier level. It partly attributed the drop to ongoing supply chain challenges and a reduced contribution from the Almirante Tamandaré floating production, storage and offloading (FPSO)... Continue Reading →

Enauta completes another well in its drilling campaign off Brazil and moves to last one

(OET) Brazilian oil and gas player Enauta has concluded the drilling and completion of another well in its drilling programme at a field offshore Brazil. In addition, the firm has started drilling activities at the last well in this drilling campaign. Back in November 2022, Enauta started drilling its first well, 7-ATL-5H-RJS, in this drilling campaign at the Atlanta... Continue Reading →

Blog at WordPress.com.

Up ↑