Petrobras and Curtiss-Wright have entered into a partnership for a new subsea pumping system intended for higher reliability and profitability

To improve the efficiency and safety of deep-water oil and gas activities, Petrobras and Curtiss-Wright have entered into a technological cooperation agreement to design a fully electric, highly reliable subsea pumping system with far less dependency on the production platform. The new equipment produced by the partnership will reduce vessel costs, enable production through long... Continue Reading →

Petrobras drills new well in the Jubarte field

(PN) Petrobras is intensifying its exploratory work in the Campos Basin. The company recently started drilling well 4-BRSA-1392D-ESS, in the Jubarte field, in a water depth of 968 meters. The activity is being carried out with the Brava Star drillship, from Constellation. The new well is classified as Adjacent Pioneer Exploration, which is drilled to... Continue Reading →

Brazilian FPSO comes back online post-maintenance

(Offshore-energy.biz) Brazilian oil and gas player Enauta has resumed production from one of its floating, production, storage, and offloading (FPSO) vessels working on a field offshore Brazil, following maintenance. Enauta reported that production in the Atlanta field in Brazilian waters was restarted on May 25, 2024, following five-day maintenance on the FPSO Petrojarl I. The platform’s operational availability... Continue Reading →

Blog at WordPress.com.

Up ↑