Oct. 1 (OE) Saipem has completed the first complex subsea structure ever built in Guyana, set for deployment at ExxonMobil’s Uaru field, marking a key milestone in the development of the Country's industrial capabilities in the subsea sector. This is the Pipeline End Termination (PLET), a terminal structure installed at the end of a subsea... Continue Reading →
Petrobras FPSO P-78 arrives at the Búzios Field
Sept. 30 - After departing the Benoi shipyard in Singapore on July 13th, the FPSO P-78 arrived today, September 30th, at the Búzios Field, in the pre-salt layer of the Santos Basin. The unit will now be connected to the wells to begin production shortly. The Búzios Field is located in ultra-deep waters of the Santos Basin at depths of up to 2,100... Continue Reading →
Brazil Is Destined to Become One of the World’s Top Five Oil Producers
Sept. 30 (oilprice) Recently, the International Energy Agency (IEA) identified Brazil as a key non-OPEC oil producer responsible for driving global production growth. A swathe of world-class ultra-deepwater pre-salt oil discoveries, the first made in the Lula field during 2006, are driving a massive offshore oil boom. Not only is Brazil Latin America’s largest oil producer, but the... Continue Reading →
MODEC Ramps Up Hammerhead FPSO Work After ExxonMobil’s Go-Ahead
Sept. 30 (OE) MODEC has been awarded the full engineering, procurement, construction, and installation (EPCI) scope to develop a floating production, storage and offloading (FPSO) vessel for the Hammerhead project in Guyana following a final investment decision (FID) by ExxonMobil. In April 2025, MODEC received a Limited Notice to Proceed (LNTP) enabling it to commence FPSO design... Continue Reading →
Baker Hughes to Supply Up to 50 Subsea Trees for Petrobras’ Brazil Fields
Sept. 29 (OE) Baker Hughes, an energy technology company, has secured a contract from Petrobras to supply up to 50 subsea tree systems and associated services to support offshore oil and gas production across multiple fields in Brazil. The modern subsea systems will enhance recovery in established fields including Albacora, Jubarte and Barracuda-Caratinga. They will... Continue Reading →
Saipem Gets Go-Ahead for ExxonMobil’s Hammerhead Job off Guyana
Sept. 26 (OE) Italian offshore energy services firm Saipem has received the authorization to proceed with the execution of activities related to the engineering, procurement, construction and installation (EPCI) contract for the development of ExxonMobil's Hammerhead oil field, offshore Guyana. The contract with ExxonMobil Guyana, valued approximately $500 million, entails the EPCI work for subsea,... Continue Reading →
ExxonMobil continues drilling at Yellowtail as ONE GUYANA FPSO ramps up production
Sept. 24 (oilnow.gy) ExxonMobil Guyana Limited (EMGL) continued developmental drilling on September 20 at the Yellowtail Project’s YT_1P10 drill center within the Stabroek Block. The Noble Don Taylor rig will carry out the operation until October 31, 2025, according to a recent notice from the Maritime Administration Department. The YT_1P10 drill center lies 105.7 nautical... Continue Reading →
Seatrium Secures ABS Backing for Deepwater FPSO Design
Seatrium has received Approval in Principle (AiP) from the American Bureau of Shipping (ABS) for its proprietary FLEXHull 1500K-M floating production storage and offloading (FPSO) design. The AiP underscores Seatrium’s ability to deliver advanced solutions for deepwater oil and gas production, the company said. The FLEXHull 1500K-M is designed to handle topside loads of up... Continue Reading →
Equinor Completes Shallow-Water Section of the Raia Project Gas Pipeline
Sept. 23 (PN) Equinor has completed the 15-km shallow-water section of the Raia Gas Pipeline. The 200-kilometer line will connect the Raia FPSO to the gas transmission network near Cabiúnas, in Macaé, Rio de Janeiro. Operations are scheduled to begin in 2028. Installation of the shallow-water section took approximately two months. In the next stage,... Continue Reading →
Exxon greenlights $6.8 billion investment for Hammerhead project in Guyana
Sept 22 (Reuters) - Exxon Mobil said on Monday it greenlit funding its seventh development project in Guyana called Hammerhead, bringing its oil joint venture another step closer to its goal of producing 1.7 million barrels of oil equivalent per day by 2030 from the country. The prolific Stabroek Block off the coast of Guyana is... Continue Reading →