Brazil: Development of the Production Sharing contracts  may require 21 FPSOs by 2029

(epbr) The development of the 18 production sharing contracts currently contracted may require the contracting of 21 production platforms (FPSOs) of up to 225 thousand barrels/per day of capacity by 2029, estimates Pré-Sal Petróleo (PPSA). — Investments in production development are estimated at US$ 72.4 billion between 2023 and 2032, which include everything from the... Continue Reading →

Exxon to Exit Equatorial Guinea

(Reuters) Exxon Mobil Corp will wind down oil production in Equatorial Guinea and leave the West African country after its license expires in 2026, two sources close to the matter told Reuters.  The departure reflects a wider move by major oil producers to reduce crude production in West Africa and shift investments to lower-carbon natural... Continue Reading →

Blog at WordPress.com.

Up ↑